MAX AEROSTRUCTURES

After purchasing a facility originally built in the late 1980s, Max Aerostructures brought in Hutton to make it like new. Using the design build method, Hutton reimagined and rebuilt the space. “This 30-year-old building really went through a transformation and came to life in a way that exceeded our expectations.” said Sean Purcell, Executive Vice President & General Manager of Max Aerostructures.

SERVICES

  • Design build
  • Project phasing
  • Cost estimating
  • Self-perform

DETAILS

Newly-launched Max Aerostructures needed a place where their manufacturing business could take off and called upon Hutton to design and remodel an existing facility.

DID YOU KNOW?

The building’s façade was inspired by the Max Aerostructures logo.

  • Max-Aerostructures-new-office-Mobile
  • Quality-control-lab-max-aerostructures-mobile
  • Max-Aerostructures-design-Mobile
  • Manufacturing-office-lounge-area-mobile
  • max-aerostructures-conference-room-mobile
  • Max-Aerostructures-quality-control-lab-mobile
max-aerostructures-new-office
New-manufacturing-facility-design

OUT WITH THE OLD

The project involved a remodel to the front office, quality control lab, building exterior, HVAC replacement and full re-roofing — all while manufacturing continued inside. "Hutton rose to the challenge and delivered on their commitments, which made the result unlike many you see in our industry," said Purcell.

max-aerostructures-design
manufacturing-office-lounge-area

TEAM SPIRIT

Purcell said the construction project was collaborative and the company always felt it had a place at the table. "The amount of thought, effort and care the Hutton team brought to this project really made the difference,” he said. "They considered all our ideas and saw the vision we had for this building."